DataBank’s DFW10 will be the second of eight, 2-story data centers with 200,000 Sq. Ft. of data center space. The Phase 1 design of the site will feature 4 buildings and a 400MW sub-station that can deliver up to 240MW of critical IT power with ability to increase this in Phase 2 for a total of 480MW across all 8 buildings. This site will feature DataBank’s Universal Data Hall Design and be HPC-ready with the ability to support rear door heat exchangers and servers supporting water-to-chip cooling.
Up Time SLA
Hours of Operation
Remote Hands
Smart Hands
Discover the DataBank Difference today:
Hybrid infrastructure solutions with boundless edge reach and a human touch.